RWTS were successfully awarded the head contract to design and construct a suitable engineered waste water treatment plant for the OZ minerals project in Carapateena South Australia.
Client: OZ Minerals
Location: Carapateena South Australia
Technology implemented: EcoFarmer 250
Industry: Mining
BACKGROUND
The OZ minerals camp design life was for 20 years with a 450 peak manning accommodation and mine services administration facility attached. OZ Minerals required a waste water treatment plant solution to facilitate the accomodation water service needs. The Remote Water Treatment solutions experts designed the arrangement of a containerised Ecofarmer 250 platform. The modular sequence was required to be constructed to accomodate the wastewater for the project over the construction phase into permanent accommodation.