If you are wanting a system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your treatment options.
RWTS with client representative Fraser Lever set out to design a suitable wastewater treatment facility for the Baralaba Caravan Park located in Central Queensland
CUSTOM BUILT WASTEWATER TREATMENT PLANT
The solution was our Advance Ecofarmer 250 platform allowing for full automation across the site. This Ecofarmer saw a complete site integration between the main pump station, remote pump station and irrigation field tank level, flow data and solenoid control in field including a wet weather solution closed out the RWTS scope.
If you are wanting a system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your treatment options.
52 Industry Place, Wynnum QLD 4178
172 Evan Street, South Mackay QLD 4740
16 Willies Road, Berrimah NT 0828
225 Kelvin Road, Orange Grove WA 6109
52 Industry Place, Wynnum QLD 4178
172 Evan Street, South Mackay QLD 4740
225 Kelvin Road, Orange Grove WA 6109
16 Willies Road, Berrimah NT 0828
Copyright © 2025. Remote Water Treatment Services