RWTS were awarded the contract by client Santos cooper basin projects to deliver an engineered wastewater treatment system catering for their remote camps waste water needs out at Tarbat operations, Queensland.
Due to the ever flocculating camp numbers (as low as 15 to 50 ep), the process of converting the BOD and Nitrogen loadings placed on the plant was a challenge.
THE RWTS SOLUTION
The RWTS process team overcame the issue by utilising a biological additive yielding 900mg/ kilo of mass dosed through our dosing system set up. The results allow for a constant and stable mixed liquor within the aeration chambers vital to the growth of essential bacteria.
The wastewater treatment system was completed within the confines of an international shipping container, making for seamless road transportation. Built from the ground up and structurally certified, the wastewater treatment system was the perfect fit for the environment. The hand rails and ladder system were compliant to code, thus allowing for safe height access. Furthermore, the turnkey design minimised the commissioning process so allowed the camp to continue business-as-usual operations while the plant was installed for remote camp tenants by 6 pm.
RESULTS
The treated effluent was then dispersed on the lease via sprinkler system and compliant to the overarching Environmentally Relevant Activity (ERA) as set out by the Queensland Department of Health.
Author
admin : When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into.
Santos Cooper Basin Remote Camp | Wastewater Treatment
Santos Cooper Basin Remote Camp | Wastewater Treatment
RWTS were awarded the contract by client Santos cooper basin projects to deliver an engineered wastewater treatment system catering for their remote camps waste water needs out at Tarbat operations, Queensland.
Client: Santos
Location: Tarbat Queensland.
Technology implemented: EcoFarmer 50
Industry: Mining
BACKGROUND
Due to the ever flocculating camp numbers (as low as 15 to 50 ep), the process of converting the BOD and Nitrogen loadings placed on the plant was a challenge.
THE RWTS SOLUTION
The RWTS process team overcame the issue by utilising a biological additive yielding 900mg/ kilo of mass dosed through our dosing system set up. The results allow for a constant and stable mixed liquor within the aeration chambers vital to the growth of essential bacteria.
The wastewater treatment system was completed within the confines of an international shipping container, making for seamless road transportation. Built from the ground up and structurally certified, the wastewater treatment system was the perfect fit for the environment. The hand rails and ladder system were compliant to code, thus allowing for safe height access. Furthermore, the turnkey design minimised the commissioning process so allowed the camp to continue business-as-usual operations while the plant was installed for remote camp tenants by 6 pm.
RESULTS
The treated effluent was then dispersed on the lease via sprinkler system and compliant to the overarching Environmentally Relevant Activity (ERA) as set out by the Queensland Department of Health.