Tropical Waste Services are a North Queensland waste handling carter that remove septic systems from surrounding townships. A localised Ecofarmer unit was designed and built to treat waste water fluid to be released back into the council sewer.
THE RWTS SOLUTION
ECOFARMER 250 – WASTE WATER TREATMENT SYSTEM
The 250 Ecofarmer waste water treatment system was designed and fabricated to ensure only quality treated effluent was released in accordance to water compliance. In addition RWTS are providing continuous service and maintenance to ensure a minimum of 20 years life expectancy.
When designing a waste water treatment system, hydraulic and organic loadings must be fixed as a basis for design. The wastewater treatment system is then sized according to this basis and the effluent standard requirements. This 250 Ecofarmer sewage treatment plant has been designed in this manner. Failure to observe the hydraulic and organic loadings may result in the discharge of effluent that does not meet the required council standards. If the loadings are not exceeded (and upstream management and servicing procedures are adequate) the treatment plant will produce a high quality secondary treated effluent. Our solution ensures only quality treated effluent stream for water compliance.
Results:
Stringent Queensland council approval and design process was completed to allow release to council sewer.
Waste water treatment and dispersal of final effluent met.
RWTS structurally engineered containerised plug and play Ecofarmer system was installed with in 5 days of mobilisation. The system is backed by RWTS remote dial in logging platform to allow our staff to maintain and record plant parameters from our Brisbane based office assisting our clients site operations.
NEED AN INNOVATIVE SYSTEM THAT DOES NOT FAIL?
If you are wanting a waste water treatment system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your waste water issues and how we can help.
Author
admin : When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into.
Tropical Waste | Waste Water Treatment System
Tropical Waste | Waste Water Treatment System
Our client, Tropical Waste chose the Ecofarmer 250 flagship waste water treatment plant to treat their onsite waste water issues.
Client: Tropical Waste –
Location: Northern Queensland
Solution: Ecofarmer 250
Industry: Industrial Waste
BACKGROUND
Tropical Waste Services are a North Queensland waste handling carter that remove septic systems from surrounding townships. A localised Ecofarmer unit was designed and built to treat waste water fluid to be released back into the council sewer.
THE RWTS SOLUTION
ECOFARMER 250 – WASTE WATER TREATMENT SYSTEM
The 250 Ecofarmer waste water treatment system was designed and fabricated to ensure only quality treated effluent was released in accordance to water compliance. In addition RWTS are providing continuous service and maintenance to ensure a minimum of 20 years life expectancy.
When designing a waste water treatment system, hydraulic and organic loadings must be fixed as a basis for design. The wastewater treatment system is then sized according to this basis and the effluent standard requirements. This 250 Ecofarmer sewage treatment plant has been designed in this manner. Failure to observe the hydraulic and organic loadings may result in the discharge of effluent that does not meet the required council standards. If the loadings are not exceeded (and upstream management and servicing procedures are adequate) the treatment plant will produce a high quality secondary treated effluent. Our solution ensures only quality treated effluent stream for water compliance.
Results:
Stringent Queensland council approval and design process was completed to allow release to council sewer.
Waste water treatment and dispersal of final effluent met.
RWTS structurally engineered containerised plug and play Ecofarmer system was installed with in 5 days of mobilisation. The system is backed by RWTS remote dial in logging platform to allow our staff to maintain and record plant parameters from our Brisbane based office assisting our clients site operations.
NEED AN INNOVATIVE SYSTEM THAT DOES NOT FAIL?
If you are wanting a waste water treatment system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your waste water issues and how we can help.
Author
admin : When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into.
[mc4wp_form id=”3866″]
Request a Quote
DO YOU STILL HAVE A QUESTION REGARING OUR SERVICES?